On this occasion my daily activities focused on helping a family member who was remodeling the kitchen of his house.
The foundation of said kitchen had not been finished when he bought his apartment, it was missing a part of the base and the top.
Today we focused on emptying two sides that will serve as support for the top of the kitchen, this was carried out after assembling the structural mesh with its respective formwork.
Part of the steel was left to serve as a mooring for the pouring of the stop. Once all the other details were done and completed, the pouring was carried out at the marked levels.
Within two days the formwork will begin to be dismantled to see the results and the corresponding top will begin to be assembled.
This report was published via Actifit app (Android | iOS). Check out the original version here on actifit.io
Height176 cm | ![]() | Weight69 kg | ![]() | Body Fat% | ![]() |
Waistcm | ![]() | Thighscm | ![]() | Chestcm | ![]() |