    The Water Project, led by HIVE, continues to make significant progress in its goal of bringing clean water to vulnerable communities in Latin America. In just 14 weeks, 90% of the construction of the first well in the region has been completed, representing a notable achievement for this initiative.

    El Proyecto Agua, liderado por HIVE, continúa avanzando de manera significativa en su objetivo de llevar agua potable a comunidades vulnerables de América Latina. En solo 14 semanas, se ha completado el 90% de la construcción del primer pozo en la región, representando un logro destacado para esta iniciativa.

    Despite facing challenges such as heavy rains that made the transfer of materials and personnel difficult, as well as a fuel crisis that aggravated these logistical complications, the team has demonstrated a high level of commitment and efficiency. This progress underscores not only the dedication of the working group, but also the transformative impact that this project will have on the quality of life of the benefited communities.

    A pesar de enfrentar desafíos como intensas lluvias que dificultaron el traslado de materiales y personal, así como una crisis de combustible que agravó estas complicaciones logísticas, el equipo ha demostrado un alto nivel de compromiso y eficiencia. Este progreso subraya no solo la dedicación del grupo de trabajo, sino también el impacto transformador que este proyecto tendrá en la calidad de vida de las comunidades beneficiadas.

    Below is a detailed analysis of the weekly progress of this essential project.

    A continuación, se ofrece un análisis detallado del avance semanal de este proyecto esencial.

    Weekly Progress

    Week of December 3-9, 2024.

    Progress was made with the tasks of cleaning and preparing the land, ensuring optimal conditions for installation. At the same time, thorough inspections were carried out to ensure compliance with established standards. During this stage, the transfer of the necessary materials was managed and a total of 500 meters of hose were installed, distributed in five rolls.

    Progreso Semanal

    Semana del 03 al 09 de diciembre
    Se avanzó con las tareas de limpieza y preparación del terreno, asegurando condiciones óptimas para la instalación. Simultáneamente, se realizaron inspecciones exhaustivas para garantizar el cumplimiento de los estándares establecidos. Durante esta etapa, se gestionó el traslado de los materiales necesarios y se instaló un total de 500 metros de manguera, distribuidos en cinco rollos.

    20250103_222607.jpeg

    20250103_222614.jpeg

    Week of December 10-16, 2024

    With the ground properly prepared, a section of hose was installed and specific cleaning was carried out in specific areas. At this stage of the project, 800 meters of hose were added, which required the use of eight rolls to ensure the efficient execution of the scheduled tasks.

    Semana del 10 al 16 de diciembre de 2024.

    Con el terreno debidamente preparado, se procedió a instalar un tramo de manguera y a realizar una limpieza específica en áreas puntuales. En esta etapa del proyecto, se incorporaron 800 metros de manguera, lo que requirió el uso de ocho rollos para garantizar la ejecución eficiente de las labores programadas.

    20250103_222740.jpeg

    20250103_222744.jpeg

    20250103_222750.jpeg

    20250103_222755.jpeg

    20250103_222734.jpeg

    20250103_222731.jpeg

    Week of December 17-22, 2024.

    The team maintained a constant pace in its work, focusing on installation and cleaning activities. During this week, significant progress was made with the installation of an additional 700 meters of hose, using seven more rolls in the process.

    Semana del 17 al 22 de diciembre de 2024.

    El equipo mantuvo un ritmo constante en sus labores, enfocándose en las actividades de instalación y limpieza. Durante esta semana, se alcanzó un avance destacado con la instalación de 700 metros adicionales de manguera, utilizando siete rollos más en el proceso.

    20250103_223008.jpeg

    20250103_223031.jpeg

    20250103_223022.jpeg

    20250103_222952.jpeg

    20250103_223002.jpeg

    20250103_222959.jpeg

    20250103_223011.jpeg

    20250103_223019.jpeg

    20250103_222949.png

    Week of December 26-30, 2024.

    This week, significant progress was made with the installation of an additional 500 metres of hose, using five more rolls during the process. This result reflects the high level of commitment, proper planning and outstanding efficiency of the team, key factors in achieving the established objectives within the planned time. This progress not only reinforces the operational capacity of the group, but also demonstrates an execution aligned with quality and compliance standards.

    Semana del 26 al 30 de diciembre de 2024.

    Esta semana se logró un importante progreso con la instalación de 500 metros adicionales de manguera, empleando cinco rollos más durante el proceso. Este resultado refleja el alto nivel de compromiso, la adecuada planificación y la destacada eficiencia del equipo, factores clave para alcanzar los objetivos establecidos dentro del tiempo previsto. Este avance no solo refuerza la capacidad operativa del grupo, sino que también demuestra una ejecución alineada con los estándares de calidad y cumplimiento.

    20250103_223220.jpeg

    Results

    The team has maintained a constant pace of work, focusing on installation and cleaning, managing to advance these weeks with 2500 meters of hose using 25 rolls.

    Thanks to efficient planning and the commitment of the collaborators, 90% of the objective has been achieved in just 14 weeks, accumulating approximately 5040 man hours since then. This progress demonstrates both the dedication to the beneficiary communities and the technical and organizational capacity of the Water Project.

    Although there is still a long way to go to complete 100% of the goal, the results obtained so far are promising. The team continues to work with determination to finish the work and guarantee access to drinking water for those who need it most. Despite the challenges faced, such as logistical difficulties and adverse weather conditions, the commitment to the advancement of the project remains firm.

    Moving towards the final goal: a functional well that positively transforms the quality of life of the benefited community is the objective.

    Resultados

    El equipo ha mantenido un ritmo constante de trabajo, enfocándose en la instalación y limpieza, logrando avanzar estas semanas con 2500 metros de manguera utilizando 25 rollos.

    Gracias a una planificación eficiente y al compromiso de los colaboradores, se ha alcanzado el 90% del objetivo en solo 14 semanas, acumulando aproximadamente 5040 horas hombre desde entonces. Este progreso evidencia tanto la dedicación hacia las comunidades beneficiarias como la capacidad técnica y organizativa del Proyecto Agua.

    Aunque aún queda camino por recorrer para completar el 100% de la meta, los resultados obtenidos hasta ahora son prometedores. El equipo sigue trabajando con determinación para finalizar la obra y garantizar el acceso a agua potable para quienes más lo necesitan. A pesar de los desafíos enfrentados, como dificultades logísticas y condiciones climáticas adversas, el compromiso con el avance del proyecto se mantiene firme.

    Avanzar hacia el objetivo final: un pozo funcional que transforme positivamente la calidad de vida de la comunidad beneficiada es el objetivo.

    We will soon be celebrating the completion of this stage!

    ¡Pronto estaremos celebrando la finalización de esta etapa!

    We will continue to report on progress in the coming weeks.

    Seguiremos informando sobre los avances en las próximas semanas.

    We thank all those who have made this project possible: @guiltyparties, @valueplan, the community, the collaborators who have achieved synergy.

    Agradecemos a todas aquellas personas que han hecho posible este proyecto: @guiltyparties, @vplan, la comunidad, los colaboradores que han logrado una sinergia.

    Each step brings us closer to providing a vital resource to hundreds of people!

    ¡Cada paso nos acerca más a brindar un recurso vital a cientos de personas!

    HIVE has been changing realities in every corner of the planet!

    ¡HIVE en cada rincón del planeta ha ido cambiando realidades!

      Authors get paid when people like you upvote their post.
      If you enjoyed what you read here, create your account today and start earning FREE VOILK!